Thursday, August 16, 2012

Energy Project RFP Alert - US VT - State Of Vermont RFP - Crcf Boiler Replacement

Alert Type:
RFP

Description:
Contractors are invited to bid on the Boiler Replacement for the Chittenden Regional Correctional Facility in South Burlington, Vermont. This project consists of, but is not limited to providing a Boiler Replacement at the Chittenden Regional Correctional Facility in South Burlington, Vermont. Sealed Bids accompanied by proper Bid Security will be received by the Department of Buildings and General Services, at 10 Baldwin Street, Montpelier, Vermont, until Wednesday, August 29, 2012 at 2:30 PM, at which time they will be opened and publicly read aloud in the department conference room. Documents may be obtained from Blueprints, Etc., 20 Farrell Street, South Burlington, VT 05403, by phone at 802.865.4503, by fax at 802.865.0027 or email to: orders@blueprintsetc.com. Project Manuals and Plans are available for preview and download at: http://www.blueprintsetc.com in the Private Plan Room. Password for the project is CRCFBOIL. Any and all notifications, releases and amendments associated with this project will be posted at http://www.blueprintsetc.com. There is a non-refundable fee of for each set of documents. Hard Copy Fee: $50.00 Downloadable Fee: $40.00 1. Please be advised that all notifications, releases, and addendums associated with this RFP will be posted on-line in the plan room where the original solicitation resides unless otherwise determined that a hard copy is necessary. The state will make no attempt to contact contractors with updated information. It is the responsibility of each contractor to periodically check the posting site for any and all notifications, releases and addendums associated with the RFP. 2. NOTE: On occasion hard copy addendums may be required due to size or type of media/requirements. If applicable and as determined by the Department of Buildings and General Services, addendums that require hard copy distribution, a copy of such addenda will be mailed or delivered for each set of plans and specifications issued to the bidders, prior to the bid date. However, it is the responsibility of the bidder to be sure they have received all addenda, and must so state the number of addenda they have received on the proposal. There will be a mandatory pre-bid meeting at the site on Friday, August 17, 2012 at 9:00 AM. We will meet at the Correctional Facility in South Burlington, Vermont. Bidder’s attention is directed to: 1. Funding Source: This project is being funded, in whole or in part, through the state’s capital construction act(s) and shall require compliance with the Vermont Prevailing Wage Rate requirements (see Attachment D, paragraph17). A complete list of occupations and associated wage rates are available on the internet at: http://www.vtlmi.info. 2. Full Bonding is required for this job. 3. Contractor is required to carry Builder’s Risk Insurance for this project. 4. It is the Bidder’s responsibility to thoroughly read and comply with all instructions and requirements of this bid solicitation. The Project Engineer, Kevin Henderson may be contacted for technical questions at 802-828-3311. For additional information: www.blueprintsetc.com

For more details please visit: http://bit.ly/PfSInj

To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today. You can also get quick access to incentives with our new Facebook app.

No comments:

Post a Comment