In general the work consists of replacing existing metal halide lighting fixtures in Mitchell
Hall fieldhouse with high performance fluorescent lighting fixtures designed for
gymnasium applications. Existing exit signs in fieldhouse will also be replaced. This
project provides low voltage lighting control system for fieldhouse. Control system will
include control/relay panels, momentary contact switches, and UL 924 emergency
lighting switching relays. Multi-level and multi-zone switching will be provided through
control system to match fieldhouse usage. This project also provides new panelboard
for normal fieldhouse lighting branch circuits as existing panelboards have limited
access. An arc flash study is required for this new panelboard. This project has limited
construction schedule due to scheduled events in fieldhouse. Actual construction shall
start no earlier than July 5, 2012. All work shall be substantially complete no later than
August 30, 2012. This project has one alternate bid to replace existing ceiling fans in
fieldhouse. For more details please visit: http://bit.ly/Kl7Xb9 To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.
Bid Description:
In general the work consists of replacing existing metal halide lighting fixtures in Mitchell
Hall fieldhouse with high performance fluorescent lighting fixtures designed for
gymnasium applications. Existing exit signs in fieldhouse will also be replaced. This
project provides low voltage lighting control system for fieldhouse. Control system will
include control/relay panels, momentary contact switches, and UL 924 emergency
lighting switching relays. Multi-level and multi-zone switching will be provided through
control system to match fieldhouse usage. This project also provides new panelboard
for normal fieldhouse lighting branch circuits as existing panelboards have limited
access. An arc flash study is required for this new panelboard. This project has limited
construction schedule due to scheduled events in fieldhouse. Actual construction shall
start no earlier than July 5, 2012. All work shall be substantially complete no later than
August 30, 2012. This project has one alternate bid to replace existing ceiling fans in
fieldhouse. For more details please visit: http://bit.ly/Kl7Xb9 To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.