Thursday, May 17, 2012

Energy Project RFP Alert - US GA - Georgia Southern University, Bid - Campus Hvac Modifications

Alert Type:
Bid

Description:
Bids must be physically on the table in the Bid Room by 2:00 P.M., at the time legally prevailing in Statesboro, Georgia on Thursday, May 31, 2012, for the construction of Campus HVAC Modifications - CAMPUS BUILDING CHILLER PLANTS, PROJECT NO. 0000-12071, located at Georgia Southern University, Statesboro, Georgia. At the time and place noted above, the bids will be publicly opened and announced. Bidding Documents may be purchased from Clayton Digital Reprographics at www.CDRepro.com (enter DFS plan room and register). You may call (912) 447-0708 for technical support. Bidders are cautioned that acquisition of Bidding Documents through any source other than Clayton Digital is not advisable. Acquisition of Bidding Documents from unauthorized sources places the bidder at risk of receiving incomplete or inaccurate information upon which to base a bid. There will be a Pre-Bid conference held on May 23, 2012, at 2:00 p.m., at the office of Facilities Planning, Design and Construction, 3769 Old Register Road, Statesboro, Georgia. Attendance at this conference is MANDATORY for any Contractor intending to bid on this project. Others may attend if they so desire. Contract, if awarded, will be on a lump sum basis. No bid may be withdrawn for a period of sixty days after time has been called on the date of opening except in accordance with the provisions of Georgia law. Bids must be accompanied by a Bid Bond made payable to the Owner in an amount equal to not less than five percent of the Bid. Both a performance bond and a payment bond will be required, each in an amount equal to 100 percent of the Contract Sum prior to execution of contract. The Owner reserves the right in its sole and complete discretion to waive technicalities and informalities. The Owner further reserves the rights in its sole and complete discretion to reject all bids and any bid that is not responsive or that is over the budget. The Owner anticipates that the contract will be awarded to the responsive and responsible bidder who provides the lowest bid within the budget. In judging whether the bidder is responsible, the Owner will consider, but is not limited to, the following: " Whether the bidder or its principals are currently ineligible, debarred, suspended, or otherwise excluded from bidding or contracting by any state or federal agency, department, or authority; MANDATORY REQUIREMENT One of the provisions of House bill 87, the Illegal Immigration Reform and Enforcement Act of 2011, is a requirement that Georgia Southern University, when entering into contracts for the physical performance of services, ensure that all contractors, subcontractors, and sub-subcontractors participate in the federal work authorization program, E-Verify.

For more details please visit: http://bit.ly/L9xst4

To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.

No comments:

Post a Comment