Energy Project RFP Alert - US MN - Department Of Natural Resources Bid - Resource Assessment Boiler Replacement And Management System Upgrade

Alert Type:
Bid

Description:
The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Remove existing Fulton boiler and replace with two new high efficiency condensing cast iron boilers. Contractor is responsible for all piping, piping insulation and electrical connections required for the boiler replacement. 2. Contractor is responsible for Upgrade/replace existing ddc controls, upgrade the existing Johnson ddc control system to a new web accessible ddc controls system. Re-commission all points and verify proper operation of all ddc controlled systems and controls. Provide new web access operation with graphics to the users operating station all controls shall be password protect and viewable using Microsoft explorer web browser or equal

For more details please visit: http://bit.ly/KBfwH9

To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.

No comments:

Post a Comment