Alert Type:
Bid Description:
STATEMENT OF WORK:
1. General: The contractor shall supply all equipment, labor and materials required to remove the existing light fixtures and replace them with High Pressure Sodium or LED fixtures, including lamps, as specified in this document. All electrical work shall conform to the (2008) National Electric Code (NEC) and the (2007) National Electric Safety Code (NESC). For more details please visit: http://bit.ly/JC4O4X To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.
Bid Description:
STATEMENT OF WORK:
1. General: The contractor shall supply all equipment, labor and materials required to remove the existing light fixtures and replace them with High Pressure Sodium or LED fixtures, including lamps, as specified in this document. All electrical work shall conform to the (2008) National Electric Code (NEC) and the (2007) National Electric Safety Code (NESC). For more details please visit: http://bit.ly/JC4O4X To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.
No comments:
Post a Comment