Friday, April 27, 2012

Energy Project RFP Alert - US NC - North Carolina Department Of Cultural Resources BID - Heating And Ac Replacement

Alert Type:
BID

Description:
The Contractor shall:
a. Be licensed in the State of North Carolina to perform heating and air conditions removal and replacement services
and provide a NC license number in the proposal.
b. Secure any necessary permits and inspections.
c. Provide proof of commercial liability insurance.
d. Remove and and replace the existing Trane heating and air conditioning system with a replacement system equal
to or better than the existing system as new.
e. Guarantee all work from defects for a period of two years. The compressor shall be warranted from defects for a
period of not less than 10(ten) years. Copies of all warranty information shall be furnished to the Department prior
to submission of the written invoice.
f. Furnish a new, 3.0 ton, split system heat pump with a minimum SEER rating of 14.
g. Equipment shall be manufactured by Trane or other approved equivalent system manufacturer.
h. Alternate brands, sizes, warranty information shall be included with proposal.
i. All materials, parts, components necessary to install the new Heat Pump system to the existing electrical supply
and duct work.
j. A new line set, thermostat wire and programmable thermostat shall be installed to insure accurate temperature
control.
k. Condensate drain system and new drain pan and drain hose shall be provided by the contractor.
l. The new unit shall contain R-410a refrigerant.
m. Provide all necessary equipment to perform the disconnection and installation of the new Heat Pump.
n. The air handler shall be installed with 10kw for supplemental (aux, emergency) heat.
o. The contractor shall provide a new outdoor pad.
p. Contractor shall remove and dispose of all old heating and air conditioning equipment off site according to State
and local codes. q.Contractor shall meet with and coordinate all activities with the Site Manager, Leigh Swain. Contractor shall defer
to the Site Director on the timing of the installation so as not to endanger visitors with contstruction.
r. Dispose of all debris off site, pursuant to local codes
s. Smooth grade all areas, sow grass seed and cover seeded areas with a mulch of wheat straw.
t. Perform the following at the Plamer Marsh House
i. Remove the limbs from the pecan tree that are 30-40 feet above the ground.
ii. Remove one standing tree complete with stump grinding
iii Prune limbs that are overhanging adjacent property and house, leaving the tree properly shaped
u. Remove one large pine limb from a tree at the AME Zion lot
The Contractor shall have performed and completed similar services for hire within the last 2 years

For more details please visit: http://bit.ly/JL2zOb

To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.

No comments:

Post a Comment