Friday, December 7, 2012

Energy Project RFP Alert - US OR - Portland State University RFP - West Heating Plant Boiler Replacement

Alert Type:
RFP

Description:
This is a request for proposals for the West Heating Plant Replacement Project. This project includes boiler demolition and installation of new boilers, campus steam system upgrades and modifications to a Peter Stott Center exhaust fan system. The estimated construction cost for this project is $1.5M. The West Heating Plant currently houses two (2) existing boilers and has space for an additional boiler. The two (2) existing boilers are both 600 HP. One (1) boiler will be demolished and one (1) boiler will stay in place and serve the campus. This project will add one (1) new 600 HP boiler, deaerator tank and additional system components. In order for the steam to be supplied to the campus from the West Heating Plant, piping system modifications will be required. These include the upsizing of steam and condensate piping located in the utility tunnel adjacent to the West Heating Plant; temporary piping may be required in order to keep the Peter Stott Center online during this project (see Alternate #3 below). Also required will be the addition of a condensate pumping station, settling tank and the demolition and installation of new condensate piping in the basement of Cramer Hall. A mandatory pre-bid conference and examination of the site and conditions will be conducted at 3:00 PM local time, December 11, 2012.Proposals are due on January 3, 2013, 1:00 PM local time.All documents are available in this procurement online.Please direct any questions to fapcontracts@pdx.edu

For more details please visit: http://t.co/NDln4Lvv

To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today. You can also get quick access to incentives with our new Facebook app or enter your own energy project here.

No comments:

Post a Comment