Alert Type:
Bid Description:
Bids will be received until Wednesday June 20, 2012 by qualified contractors at 3:00 p.m. at
the office of the Manchester Water Works at address noted above. Bids received after this time
will not be accepted. Bids will be opened and publicly read aloud after specified closing time.
All interested parties are invited to attend. No bid shall be withdrawn for a period of sixty (60)
days subsequent to the opening of bids without the written consent of the Manchester Water
Works.
Project involves provisions of all labor, equipment, supervision and materials necessary to
perform removal of an old boiler and installation of a new boiler system as detailed in the
construction documents and located at the Manchester Water Works. Construction start date is
to be coordinated with the owner but is anticipated to be on or about late June 2012 with
completion by Mid September 2012 or earlier. The Owner will occupy the existing facility
during this timeframe. For more details please visit: http://bit.ly/MJG0Oa To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today. You can also get quick access to incentives with our new Facebook app.
Bid Description:
Bids will be received until Wednesday June 20, 2012 by qualified contractors at 3:00 p.m. at
the office of the Manchester Water Works at address noted above. Bids received after this time
will not be accepted. Bids will be opened and publicly read aloud after specified closing time.
All interested parties are invited to attend. No bid shall be withdrawn for a period of sixty (60)
days subsequent to the opening of bids without the written consent of the Manchester Water
Works.
Project involves provisions of all labor, equipment, supervision and materials necessary to
perform removal of an old boiler and installation of a new boiler system as detailed in the
construction documents and located at the Manchester Water Works. Construction start date is
to be coordinated with the owner but is anticipated to be on or about late June 2012 with
completion by Mid September 2012 or earlier. The Owner will occupy the existing facility
during this timeframe. For more details please visit: http://bit.ly/MJG0Oa To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today. You can also get quick access to incentives with our new Facebook app.
No comments:
Post a Comment