Installation of Wind Turbine System. a) Contractor shall Construct and Install a Wind Turbine System. Contractor shall acquire wind turbine, provide foundation, tower, conduit, installation, all hardware, interconnection with utility company, permits, as-built drawings of system installation, metal, wood, stucco and sheetrock repair with no less than one (1) year system warranty. (1) National Stock Number (NSN) - Not Applicable (2) Tower: System will be mounted on a freestanding monopole, metal tower with a height of no less than ninety-five (95) feet. (3) Foundation: Contractor will construct in-ground concrete foundation to support the freestanding monopole tower and wind turbine in accordance with the Wind Turbine manufacturer's specifications (4) Wind Turbine: Gaia Wind Limited GW 133-11KW, OR EQUAL (a) Rotor: Twin Blade. Fixed Rotation Speed
(b) Gear Box - Two Stage
(c) Annual Power @ Average- (i) 4m/s = 15,000kw/h or better
(ii) 5m/s = 23,000kw/h or better
(iii) 6m/s = 32,000kw/h or better
(iv) 7m/s = 41,000kw/h or better (5) Quantity: One Wind Turbine System (6) Unit of Issue: each (7) Destination Information: Exact location of the foundation and Wind Turbine system will be designated by the local POC at Black Butte Lake and Dam, Buckhorn Recreation Area, Orland, Tehama County, CA. For more details please visit: http://bit.ly/MUrOf7 To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today. You can also get quick access to incentives with our new Facebook app.
RFP Description:
Installation of Wind Turbine System. a) Contractor shall Construct and Install a Wind Turbine System. Contractor shall acquire wind turbine, provide foundation, tower, conduit, installation, all hardware, interconnection with utility company, permits, as-built drawings of system installation, metal, wood, stucco and sheetrock repair with no less than one (1) year system warranty. (1) National Stock Number (NSN) - Not Applicable (2) Tower: System will be mounted on a freestanding monopole, metal tower with a height of no less than ninety-five (95) feet. (3) Foundation: Contractor will construct in-ground concrete foundation to support the freestanding monopole tower and wind turbine in accordance with the Wind Turbine manufacturer's specifications (4) Wind Turbine: Gaia Wind Limited GW 133-11KW, OR EQUAL (a) Rotor: Twin Blade. Fixed Rotation Speed
(b) Gear Box - Two Stage
(c) Annual Power @ Average- (i) 4m/s = 15,000kw/h or better
(ii) 5m/s = 23,000kw/h or better
(iii) 6m/s = 32,000kw/h or better
(iv) 7m/s = 41,000kw/h or better (5) Quantity: One Wind Turbine System (6) Unit of Issue: each (7) Destination Information: Exact location of the foundation and Wind Turbine system will be designated by the local POC at Black Butte Lake and Dam, Buckhorn Recreation Area, Orland, Tehama County, CA. For more details please visit: http://bit.ly/MUrOf7 To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today. You can also get quick access to incentives with our new Facebook app.