Front office replacement of 10 ton split and BAS controls to include existing VAV boxes and 1 additional VAV box
1 Remove and dispose of existing 10 ton split system including air handler, and condenser (condenser is located on roof)
2 Modify existing bypass duct to control space which is currently “slaved” from adjacent room.
i Existing room feeder will need to be shortened and blanked.
3 Install new 10 ton Air handler. Options to include:
i DX coil (new refrigerant line set)
ii Steam Coil
iii Electric heat pack (to be wired by contractor)
iv VFD fan control
v Safety lockouts to include; evaporator coil freeze protection device, air flow proving switch,
amperage safety device, condensate overflow shutoff device
4 Install new matching condenser unit on roof (2 story roof)
i Voltage safety device or phase protection if applicable
ii All roof penetrations / alterations to be performed by roofing contractor coordinated through WLPS
5 New fresh air motorized damper to be installed on existing roof curb
6 Install one additional VAV box and associated controls to existing ducted run
7 All ducting including VAV boxes to be fully insulated with appropriate duct wrap per code requirements
8 All finished work to be fully commissioned and documented to include an air balance report (all documentation to be signed off by WLPS HVAC dept.)
9 Replace all controls For more details please visit: http://bit.ly/Rvfqde To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today. You can also get quick access to incentives with our new Facebook app or enter your own energy project here.
RFP Description:
Front office replacement of 10 ton split and BAS controls to include existing VAV boxes and 1 additional VAV box
1 Remove and dispose of existing 10 ton split system including air handler, and condenser (condenser is located on roof)
2 Modify existing bypass duct to control space which is currently “slaved” from adjacent room.
i Existing room feeder will need to be shortened and blanked.
3 Install new 10 ton Air handler. Options to include:
i DX coil (new refrigerant line set)
ii Steam Coil
iii Electric heat pack (to be wired by contractor)
iv VFD fan control
v Safety lockouts to include; evaporator coil freeze protection device, air flow proving switch,
amperage safety device, condensate overflow shutoff device
4 Install new matching condenser unit on roof (2 story roof)
i Voltage safety device or phase protection if applicable
ii All roof penetrations / alterations to be performed by roofing contractor coordinated through WLPS
5 New fresh air motorized damper to be installed on existing roof curb
6 Install one additional VAV box and associated controls to existing ducted run
7 All ducting including VAV boxes to be fully insulated with appropriate duct wrap per code requirements
8 All finished work to be fully commissioned and documented to include an air balance report (all documentation to be signed off by WLPS HVAC dept.)
9 Replace all controls For more details please visit: http://bit.ly/Rvfqde To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today. You can also get quick access to incentives with our new Facebook app or enter your own energy project here.