Alert Type:
Bid Description:
The project is located at the El Dorado County Government
Center Buildings on Fair Lane, and Fairlane Court, in Placerville, in El Dorado County as shown on the Contract
Document cover sheet and in Attachment A. The Work to be done generally consists of, but is not limited to:
A. Building A Lighting Replacements consists of furnishing all labor, tools, material and equipment required
to replace and retrofit the following in accordance with Article 3 of the Draft Agreement:
1. Replace three hundred seventeen (317) 2x4 18 cell parabolic troffer with specular reflector and
2F32T8 fixtures, with 1F32T8C fixtures each with ALP RDI AC HT Kit or approved equal.
2. Retrofit seventy-four (74) 4' strip with 1F32T8 fixtures, to 1F32T8L fixtures.
3. Retrofit sixty-four (64) 4' wrap around with 2F34T8 fixtures, to 2F32T8L fixtures.
4. Retrofit five (5) 4' wrap with 2F34T12 fixtures, to 2F32T8L fixtures.
5. Retrofit five (5) 2x4 lensed troffer with 3F32T8 fixtures, to 2F32T8L fixtures in outboard lamp
holders.
6. Retrofit thirty-three (33) 2x4 lensed troffer with 2F32T8 and often a reflector fixtures, to 1F32T8C
fixtures each with 1-cove white reflector.
7. Retrofit twenty-five (25) 2x4 lensed troffer with 2F34T12 fixtures, to 1F32T8C fixtures each with 1-
cove white reflector.
8. Retrofit ten (10) pair of end to end 2x4 lensed troffers, each with 2F32T8 and specular reflector
fixtures, to 2F32T8C fixtures each with two 1-cove white reflectors For more details please visit: http://bit.ly/xySHde To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.
Bid Description:
The project is located at the El Dorado County Government
Center Buildings on Fair Lane, and Fairlane Court, in Placerville, in El Dorado County as shown on the Contract
Document cover sheet and in Attachment A. The Work to be done generally consists of, but is not limited to:
A. Building A Lighting Replacements consists of furnishing all labor, tools, material and equipment required
to replace and retrofit the following in accordance with Article 3 of the Draft Agreement:
1. Replace three hundred seventeen (317) 2x4 18 cell parabolic troffer with specular reflector and
2F32T8 fixtures, with 1F32T8C fixtures each with ALP RDI AC HT Kit or approved equal.
2. Retrofit seventy-four (74) 4' strip with 1F32T8 fixtures, to 1F32T8L fixtures.
3. Retrofit sixty-four (64) 4' wrap around with 2F34T8 fixtures, to 2F32T8L fixtures.
4. Retrofit five (5) 4' wrap with 2F34T12 fixtures, to 2F32T8L fixtures.
5. Retrofit five (5) 2x4 lensed troffer with 3F32T8 fixtures, to 2F32T8L fixtures in outboard lamp
holders.
6. Retrofit thirty-three (33) 2x4 lensed troffer with 2F32T8 and often a reflector fixtures, to 1F32T8C
fixtures each with 1-cove white reflector.
7. Retrofit twenty-five (25) 2x4 lensed troffer with 2F34T12 fixtures, to 1F32T8C fixtures each with 1-
cove white reflector.
8. Retrofit ten (10) pair of end to end 2x4 lensed troffers, each with 2F32T8 and specular reflector
fixtures, to 2F32T8C fixtures each with two 1-cove white reflectors For more details please visit: http://bit.ly/xySHde To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.
No comments:
Post a Comment