Alert Type:
BID Description:
The proposed work includes:
Phase I - Sidewalk & Lighting Enhancements
Construction of the following:
- Sidewalk with Curb and Ramp Improvements
- Business Entrance Step(s) / Landing Improvements
- Street Lighting Improvements The wage rates applicable to this project have been predetermined as required by law and are set
forth in the bid proposal. When Federal wage rates are applicable and included, this contract is
subject to the "Work Hours Act of 1962," (P.L. 87-581: 76 Stat. 357) and implementing regulations. For more details please visit: http://bit.ly/ymDtL3 To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.
BID Description:
The proposed work includes:
Phase I - Sidewalk & Lighting Enhancements
Construction of the following:
- Sidewalk with Curb and Ramp Improvements
- Business Entrance Step(s) / Landing Improvements
- Street Lighting Improvements The wage rates applicable to this project have been predetermined as required by law and are set
forth in the bid proposal. When Federal wage rates are applicable and included, this contract is
subject to the "Work Hours Act of 1962," (P.L. 87-581: 76 Stat. 357) and implementing regulations. For more details please visit: http://bit.ly/ymDtL3 To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.
No comments:
Post a Comment