Alert Type:
BID Description:
Pursuant to Massachusetts General Laws Chapter 7, §§ 38A½ - 38O, the City of Boston’s Public Facilities Department (PFD), is requesting qualification statements for design services including Schematic Plans and Outline Specifications; Design Development Plans and Specifications; Construction Plans and Specifications; Administration of Construction Contract; and Construction Supervision for the Air Conditioning System at City Hall Data Center project with an estimated construction cost of $700,000.00. The scope of work includes all architectural and engineering services associated with air-conditioning upgrades, including the replacement of the existing cooling tower and computer room air conditioning; design an appropriate system for cooling the Data Center equipment giving consideration to efficiency, reliability and growth; and construction administration. Project fees will follow the schedule as stated in the application form. Completion shall be 104 weeks after execution of a contract. Applicants must be a registered engineer in the Commonwealth of Massachusetts. A program for this project will not be prepared beyond the scope stated above. The project will be performed under applicable M.G.L. c. 149 §§ 44 A-J. Applicants must provide the names of key personnel and consultants that will be utilized on this project for the following disciplines: structural engineer, electrical engineer, HVAC engineer, fire protection engineer, fire alarm engineer, cost estimator. Applicants, at a minimum, must have prior experience on projects in the following: urban setting For more details please visit: http://bit.ly/JZJ6to To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.
BID Description:
Pursuant to Massachusetts General Laws Chapter 7, §§ 38A½ - 38O, the City of Boston’s Public Facilities Department (PFD), is requesting qualification statements for design services including Schematic Plans and Outline Specifications; Design Development Plans and Specifications; Construction Plans and Specifications; Administration of Construction Contract; and Construction Supervision for the Air Conditioning System at City Hall Data Center project with an estimated construction cost of $700,000.00. The scope of work includes all architectural and engineering services associated with air-conditioning upgrades, including the replacement of the existing cooling tower and computer room air conditioning; design an appropriate system for cooling the Data Center equipment giving consideration to efficiency, reliability and growth; and construction administration. Project fees will follow the schedule as stated in the application form. Completion shall be 104 weeks after execution of a contract. Applicants must be a registered engineer in the Commonwealth of Massachusetts. A program for this project will not be prepared beyond the scope stated above. The project will be performed under applicable M.G.L. c. 149 §§ 44 A-J. Applicants must provide the names of key personnel and consultants that will be utilized on this project for the following disciplines: structural engineer, electrical engineer, HVAC engineer, fire protection engineer, fire alarm engineer, cost estimator. Applicants, at a minimum, must have prior experience on projects in the following: urban setting For more details please visit: http://bit.ly/JZJ6to To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.
No comments:
Post a Comment