Alert Type:
Bid Description:
The project includes removal of a portion of the existing HVAC system,
replacement with a variable refrigerant system (VRS) as well as roof and
finish repairs associated with the
HVAC work. Of the approximately 69,000SF school roof the base project
requires replacement of 29,400SF, with another 7,700SF, of roof replacement
as an additive bid alternate. For more details please visit: http://bit.ly/Jfj57N To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.
Bid Description:
The project includes removal of a portion of the existing HVAC system,
replacement with a variable refrigerant system (VRS) as well as roof and
finish repairs associated with the
HVAC work. Of the approximately 69,000SF school roof the base project
requires replacement of 29,400SF, with another 7,700SF, of roof replacement
as an additive bid alternate. For more details please visit: http://bit.ly/Jfj57N To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.
No comments:
Post a Comment