Alert Type:
BID Description:
The work generally consists of replacing a roof top utility set exhaust fan, motors and
drives for four (4) existing air handling units, providing a new variable refrigerant flow air
conditioning system with one (1) air cooled condensing units and eleven (11) fan coil
units, galvanized steel sheetmetal ductwork, refrigerant piping, duct and pipe insulation,
structural steel, gypsum board, painting, electrical work and related accessories.
The estimated construction cost is $250,000 and $500,000. PDF: http://hawaii.gov/spo2011/spo/notices/notices/plomino_documents/12-20-2591/getfile?filename=202591-lanakila-health-center-ac-imp.pdf For more details please visit: http://bit.ly/HZr87g To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.
BID Description:
The work generally consists of replacing a roof top utility set exhaust fan, motors and
drives for four (4) existing air handling units, providing a new variable refrigerant flow air
conditioning system with one (1) air cooled condensing units and eleven (11) fan coil
units, galvanized steel sheetmetal ductwork, refrigerant piping, duct and pipe insulation,
structural steel, gypsum board, painting, electrical work and related accessories.
The estimated construction cost is $250,000 and $500,000. PDF: http://hawaii.gov/spo2011/spo/notices/notices/plomino_documents/12-20-2591/getfile?filename=202591-lanakila-health-center-ac-imp.pdf For more details please visit: http://bit.ly/HZr87g To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.
No comments:
Post a Comment