Alert Type:
Bid Description:
Scope of Work:
1 EXISTING CONDITIONS: Existing hot water boiler with the following
specifications is located at Orchard Mesa Community Center Pool: 1 (one) 1200
MBH input, 972 MBH output boiler with power burners. There is an existing solar
water heater that will remain.
2 LOCATION AND NEW EQUIPMENT SPECIFICATIONS:
Orchard Mesa Community Center Pool: 1 Brand Name or Equal to RBI Future by
Fusion boiler model CB/CW 1250 with 1250 MBH input, 1200MBH output. Boiler
will stay in sequence with solar water heating system.
3 Remove and replace existing boiler with high-efficiency gas hot water
boilers as follows:
1. Shut off, isolate, drain, and temporarily cap connecting system to the
existing HW boiler.
a. Natural gas line will be intercepted and reused
b. Makeup water will remain as existing
c. Breaching is to be disconnected
d. Expansion tank is to remain
e. Reuse existing electrical connections
f. Hot water supply and return lines will be reused
2. Shut off and isolate hot water pump connection from the boiler and
retain pump
3. Demo and disposal of existing boiler and immediate piping
4. Provide and install new hot water boiler (see equipments specs above)
5. Provide and install HW boiler installation components as needed,
including but not limited to:
a. Natural gas line and associated code required gas train
b. Boiler pad as needed
c. Make up water reconnection
d. Existing water treatment system will remain as-is
e. Use existing electrical service to boiler for new boiler electrical
f. Provide new isolation valves to boiler
g. Electrical connections as required
h. Provide and install remote kill-switch for the boiler as required
by code
i. Boiler PRV and drain piping to floor drain
j. Pumps will remain as-is
k. Reuse existing expansion tank
l. Provide new insulation on piping to and from boiler
m. Provide sealed combustion air supply ducting to the boilers
n. Provide new flue venting to the roof
o. Reattach existing solar heating unit to HW boiler in sequence
6. Provide factory startup and commission of the new boiler
7. Provide staff operational training for new boiler
NOTE: The solar heating system shall remain functioning during this
project. It is the intent that the pool shall remain open for normal business
during this project. For more details please visit: http://bit.ly/PPU2j4 To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today. You can also get quick access to incentives with our new Facebook app.
Bid Description:
Scope of Work:
1 EXISTING CONDITIONS: Existing hot water boiler with the following
specifications is located at Orchard Mesa Community Center Pool: 1 (one) 1200
MBH input, 972 MBH output boiler with power burners. There is an existing solar
water heater that will remain.
2 LOCATION AND NEW EQUIPMENT SPECIFICATIONS:
Orchard Mesa Community Center Pool: 1 Brand Name or Equal to RBI Future by
Fusion boiler model CB/CW 1250 with 1250 MBH input, 1200MBH output. Boiler
will stay in sequence with solar water heating system.
3 Remove and replace existing boiler with high-efficiency gas hot water
boilers as follows:
1. Shut off, isolate, drain, and temporarily cap connecting system to the
existing HW boiler.
a. Natural gas line will be intercepted and reused
b. Makeup water will remain as existing
c. Breaching is to be disconnected
d. Expansion tank is to remain
e. Reuse existing electrical connections
f. Hot water supply and return lines will be reused
2. Shut off and isolate hot water pump connection from the boiler and
retain pump
3. Demo and disposal of existing boiler and immediate piping
4. Provide and install new hot water boiler (see equipments specs above)
5. Provide and install HW boiler installation components as needed,
including but not limited to:
a. Natural gas line and associated code required gas train
b. Boiler pad as needed
c. Make up water reconnection
d. Existing water treatment system will remain as-is
e. Use existing electrical service to boiler for new boiler electrical
f. Provide new isolation valves to boiler
g. Electrical connections as required
h. Provide and install remote kill-switch for the boiler as required
by code
i. Boiler PRV and drain piping to floor drain
j. Pumps will remain as-is
k. Reuse existing expansion tank
l. Provide new insulation on piping to and from boiler
m. Provide sealed combustion air supply ducting to the boilers
n. Provide new flue venting to the roof
o. Reattach existing solar heating unit to HW boiler in sequence
6. Provide factory startup and commission of the new boiler
7. Provide staff operational training for new boiler
NOTE: The solar heating system shall remain functioning during this
project. It is the intent that the pool shall remain open for normal business
during this project. For more details please visit: http://bit.ly/PPU2j4 To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today. You can also get quick access to incentives with our new Facebook app.