Sealed bids subject to terms and conditions of this invitation will be received by Norfolk Public Schools Purchasing Agent at 800 E. City Hall Avenue, Room 1205, Norfolk, Virginia 23510-2723 on the due date and time specified, and then publicly opened and read.Remove and replace the Boilers at Easton Pre-School.
1. Provide all work required for this division including all labor, materials, equipment, appurtenances
and services to provide complete mechanical systems as shown on the drawings and specified in this
division of the specifications. The word "provide" shall mean "furnish and install complete and ready
for use.”
2. Site Review: The contractor shall visit the site prior to bid to determine the extent of the work. Lock
of knowledge of existing conditions will not be considered a basis for change orders. Prior to ordering
equipment, verify that equipment to be provided under this contract is acceptable, can fit into
building and room. Expense incurred by the contractor, which in the engineer's opinion could have
been avoided by this step, shall not be a basis for change orders.
3. Drawings and Specifications: The drawings are diagrammatic and indicate the general extent,
character and arrangement of equipment, fixtures and piping systems. It is the intention of these
specifications and drawings to fully cover all work and materials for a complete, first- class
mechanical installation, and any devices usually employed in this class of work, though not
specifically mentioned or shown on the drawings or in the Specification, but which may be necessary
for the satisfactory completion of the work, shall be furnished and installed by the contractor as a
port of his total work under this division. Consult the specifications and drawings of all other trades
and perform all mechanical work required therein. Cooperate with all other contractors or
subcontractors to furnish complete workable systems.
4. Submittals: Submit shop drawings, product data and samples within thirty (30) days of award of
contract and in accordance with the general conditions and special conditions. Submittals are
required for all items provided under this specification. Review of submittals by the engineer and any
associated action taken by the engineer does not relieve the contractor of any requirements set
forth by the contract documents. Incomplete submittals shall not be reviewed.
5. Scheduling: Work under this division shall proceed in advance of the work of others whenever
possible, eliminating all cutting and patching. When such procedure is impossible, cutting and
patching shall be done in an approved manner. Cutting shall not endanger structural integrity in any
way. Patching shall exactly match contiguous work. Actual work of cutting and patching of existing
surfaces shall be performed by the subcontractor who originally prepared these surfaces, e.g.,
cutting and patching of masonry wall will be performed by the masonry subcontractor. Costs of such
cutting and patching shall be borne by the mechanical subcontractor. Cutting shall be carefully done
and damage to building, piping, wiring or equipment as a result of cutting shall be repaired by skilled
mechanics of trade involved.IFB For more details please visit: http://t.co/yYAtqdHC To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today. You can also get quick access to incentives with our new Facebook app or enter your own energy project here.
Bid Description:
Sealed bids subject to terms and conditions of this invitation will be received by Norfolk Public Schools Purchasing Agent at 800 E. City Hall Avenue, Room 1205, Norfolk, Virginia 23510-2723 on the due date and time specified, and then publicly opened and read.Remove and replace the Boilers at Easton Pre-School.
1. Provide all work required for this division including all labor, materials, equipment, appurtenances
and services to provide complete mechanical systems as shown on the drawings and specified in this
division of the specifications. The word "provide" shall mean "furnish and install complete and ready
for use.”
2. Site Review: The contractor shall visit the site prior to bid to determine the extent of the work. Lock
of knowledge of existing conditions will not be considered a basis for change orders. Prior to ordering
equipment, verify that equipment to be provided under this contract is acceptable, can fit into
building and room. Expense incurred by the contractor, which in the engineer's opinion could have
been avoided by this step, shall not be a basis for change orders.
3. Drawings and Specifications: The drawings are diagrammatic and indicate the general extent,
character and arrangement of equipment, fixtures and piping systems. It is the intention of these
specifications and drawings to fully cover all work and materials for a complete, first- class
mechanical installation, and any devices usually employed in this class of work, though not
specifically mentioned or shown on the drawings or in the Specification, but which may be necessary
for the satisfactory completion of the work, shall be furnished and installed by the contractor as a
port of his total work under this division. Consult the specifications and drawings of all other trades
and perform all mechanical work required therein. Cooperate with all other contractors or
subcontractors to furnish complete workable systems.
4. Submittals: Submit shop drawings, product data and samples within thirty (30) days of award of
contract and in accordance with the general conditions and special conditions. Submittals are
required for all items provided under this specification. Review of submittals by the engineer and any
associated action taken by the engineer does not relieve the contractor of any requirements set
forth by the contract documents. Incomplete submittals shall not be reviewed.
5. Scheduling: Work under this division shall proceed in advance of the work of others whenever
possible, eliminating all cutting and patching. When such procedure is impossible, cutting and
patching shall be done in an approved manner. Cutting shall not endanger structural integrity in any
way. Patching shall exactly match contiguous work. Actual work of cutting and patching of existing
surfaces shall be performed by the subcontractor who originally prepared these surfaces, e.g.,
cutting and patching of masonry wall will be performed by the masonry subcontractor. Costs of such
cutting and patching shall be borne by the mechanical subcontractor. Cutting shall be carefully done
and damage to building, piping, wiring or equipment as a result of cutting shall be repaired by skilled
mechanics of trade involved.IFB For more details please visit: http://t.co/yYAtqdHC To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today. You can also get quick access to incentives with our new Facebook app or enter your own energy project here.