Alert Type:
Bid Description:
Work consists of furnishing all plant, labor, materials, equipment and performing all work in strict accordance with those specifications, schedules and drawings forming parts thereof to Repair/Replace the HVAC System, Building 36, Section 6E. Work includes removal and replacement of two air handling units, removal and replacement of Variable Air Volume (VAV) Units and Fan Terminal Units, and removal and replacement of a limited amount of ductwork.
The work shall be performed by a general contractor with experience in commercial/office building HVAC systems.
All work shall be accomplished in strict accordance with applicable NGA, EPA, NFPA, and OSHA requirements.
The performance period for this project is 220 calendar days. The office areas served by these systems will remain occupied for the duration of the contract. The contractor shall be required to maintain HVAC services throughout the contract. The contractor will also be required to perform much of the work outside the normal working hours to minimize disruption of Government services. For more details please visit: http://bit.ly/L54P5Y To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today. You can also get quick access to incentives with our new Facebook app.
Bid Description:
Work consists of furnishing all plant, labor, materials, equipment and performing all work in strict accordance with those specifications, schedules and drawings forming parts thereof to Repair/Replace the HVAC System, Building 36, Section 6E. Work includes removal and replacement of two air handling units, removal and replacement of Variable Air Volume (VAV) Units and Fan Terminal Units, and removal and replacement of a limited amount of ductwork.
The work shall be performed by a general contractor with experience in commercial/office building HVAC systems.
All work shall be accomplished in strict accordance with applicable NGA, EPA, NFPA, and OSHA requirements.
The performance period for this project is 220 calendar days. The office areas served by these systems will remain occupied for the duration of the contract. The contractor shall be required to maintain HVAC services throughout the contract. The contractor will also be required to perform much of the work outside the normal working hours to minimize disruption of Government services. For more details please visit: http://bit.ly/L54P5Y To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today. You can also get quick access to incentives with our new Facebook app.