Alert Type:
BID Description:
SCOPE OF WORK: Project includes the following amenities: Security Lighting Design for this exiting half mile walking trail on a ten acre parcel adjacent to the existing Cora Coleman Senior Center and Robert E “Bob” Price Recreation Center. Add 2 new drinking fountains. Upgrade an exiting drinking fountain with seating, fitness courts (2 shuffle board, 2 bocce and 2 horse shoe, seating, and gane tables).
ESTIMATED COST: $380,000 - $400,000
For more details please visit: http://bit.ly/yEL509 To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.
BID Description:
SCOPE OF WORK: Project includes the following amenities: Security Lighting Design for this exiting half mile walking trail on a ten acre parcel adjacent to the existing Cora Coleman Senior Center and Robert E “Bob” Price Recreation Center. Add 2 new drinking fountains. Upgrade an exiting drinking fountain with seating, fitness courts (2 shuffle board, 2 bocce and 2 horse shoe, seating, and gane tables).
ESTIMATED COST: $380,000 - $400,000
For more details please visit: http://bit.ly/yEL509 To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.
No comments:
Post a Comment