Tuesday, December 13, 2011

Energy Project RFP Alert - US IL - The Board Of Education Of School District U-46 Bid - School Domestic And Hvac Piping, Boiler, Chiller And Air Handler Units Replacement And Electrical Work

Alert Type:
Bid

Description:
Sealed lump sum bids will be received for domestic and HVAC piping, boiler, chiller and air handler units replacement and electrical work and all associated work at Larkin High School, 1475 Larkin Avenue, Elgin, Illinois 60123. PROJECT DESCRIPTION: Domestic and HVAC piping, boiler, chiller and air handler units replacement and electrical work and all associated work. BONDS REQUIRED: A Performance Bond and Material & Labor Payment Bond will be required from the General Contractor for 100% of the contract sum, payable to the Owner. PREQUALIFICATION PROCEDURE: All interested bidders are required to complete an AIA Document A305 Contractor's Qualification Statement and forms A4, A5, A6, A7, A8, A10, and B5, and submit them along with the Form of Bid at the time of bid. MANDATORY PRE-BID MEETING: A mandatory pre-bid meeting is scheduled for Tuesday, December 20, 2011, at 10:00 a.m. at Larkin High School, located at 1475 Larkin Avenue, Elgin, Illinois 60123. BIDS:All bids must be accompanied by a Bid Bond of five percent (5%) of the amount of the base bid(s), and all alternates and allowances, or cashiers check made payable to School District U-46. All bid documents must be submitted as one (1) original and two (2) copies. BID GUARANTEE: Contractors shall guarantee their submitted Bid Proposal for a ninety (90) day period from the date of Bid Opening. PREVAILING WAGE LAW: This contract calls for the construction of a "public work," within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. ("the Act"). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the "prevailing rate of wages" (hourly cash wages plus fringe benefits) in the county where the work is performed. For information regarding current prevailing wage rates, please refer to the Illinois Department of Labor's website at: http://www.state.il.us/agency/idol/rates/rates.HTM. All contractors and sub-contractors rendering services under this contract must comply with all requirements of the Act, including but not limited to, all wage, notice and record keeping duties. DUE DATE: Bids will be due on Monday, January 9, 2012, at 2:00 p.m. local time at the Educational Services Center, Business Services Department in Room 119, 355 E. Chicago Street, Elgin, Illinois and will be publicly opened and read at that time. Faxed or late bids will NOT be accepted. A non-refundable fee of $75.00 will be required for each set of bid documents. Checks shall be payable to School District U-46. A maximum of three sets can be obtained. Bid documents will be available starting Monday, December 12, 2011, through BHFX, 19 N. Union Street, Elgin, Illinois 60123. Phone 847-742-2876;email elgin@bhfx.net. For more information please contact Mechanical Services Associates Corp., Jeff Leverenz, 815-788-8901, Ext. 203.

For more details please visit: http://bit.ly/ryflhF

To learn about all the energy incentives and projects available, check out www.energygridiq.com or download our iOS app Watt Rebate today.

No comments:

Post a Comment